Simplistic Pricing.
Know What to Budget.

What's included in the price of a Lane One Home?

Additional costs to be determined, they may include some of the following:

Included with the Unit:

  • Dedicated project manager
  • Complete unit built in factory
  • Customized designs
  • Pre-approved architectural plans
  • Municipal permit services

Additional Items:

  • Craning of the unit
  • ​Delivery & installation
  • Foundation
  • Utility connections
  • Sales tax and permit fees

Not Included:

  • Demolition of any existing structures
  • Tree or vegetation removal
  • Site engineering

On average, what do clients pay?

These costs are averages paid on services based on previous clients for single units, prices vary for multi-family.

Foundation Work

$5,000-10,000

Transportation & Delivery

$3,000-10,000

Permits & Fees

$2,500-25,000

Craning

$15,000-25,000

Utility Connections

$2,000-15,000

Sales Tax

12% in BC

the-maple-prefab-steel-frame-home-in-neighbourhood1.jpg

What type of deposits & draws are due, and when?

The cost of a home with us is broken up into many sections: design, construction & installation phases.

1A

Design & Contract Signing

$10,000 Design Fee

Contract signing and payment, finalize layouts, materials + finishes, City authorization signed, application submitted, site survey and other administration tasks. A portion of this cost is refunded into the cost of the home construction.

Approximately 2-4 weeks depending on client revisions.
Feasibility Study

$10,000 Feasibility Fee

1B

(If applicable - not always required)
A feasibility study may be required to vet the property to ensure that the project scope, zoning considerations & other restrictions wont impact the development.

Approx. 2-4 weeks depending on contractor availability.

2

Starting Construction

35% Draw Required

 Construction contract signed. We calculate the full cost of the project from the unit + transportation + installation + permits and finally tax. We start any land preparation, utilities and trenching required.

Approximately 2-4 weeks.
Lockup (in factory)

30% Draw Required

3

The unit has been constructed to lockup state meaning the unit is framed with siding and roofing, insulation, plumbing + electrical, windows and doors. Land prep is well underway and any contractors of utilities are being installed.

Approximately 4-6 weeks.

4

Completion & Walkthrough

30% Draw Required

The unit has been finished to the maximum in-factory development possible allowing for transportation and installation on site. The land prep is complete and awaiting arrival of the unit.

Approximately 2-3 weeks.
Delivery & Keys

5% Draw Required

5

The final draw is due upon successful delivery, installation, appliances, inspection and keys. The unit will arrive on a truck, be placed/craned into position, attached to the foundation, utilities connect, any agreed upon landscaping completed, building skirted & appliances installed.

Approximately 2 weeks.

Have more questions regarding our pricing & timelines? Schedule a discovery call with us or visit our show home.